Medium and high voltage systems demand precise design, protection and grid coordination. NOVTRIQ delivers MV and HV power engineering for 11kV and 33kV networks, covering substation design, protection coordination and grid connection, so that new and upgraded connections are safe, compliant and reliable.
Discuss Your ProjectWe design MV and HV substations from concept single-line through to equipment schedules, specifying switchgear, transformers and protection to IEC 61936 and relevant BS EN standards. Ratings are set from fault-level and load studies so that plant is neither under-rated for safety nor over-specified for cost.
Protection is graded to isolate faults quickly while preserving supply to healthy circuits. Load flow, short-circuit and arc flash studies underpin relay settings, discrimination and equipment ratings, giving a coherent, safe and selective protection scheme across the network.
For new and upgraded connections, we manage the technical path: G99 compliance, network operator applications, capacity studies and coordination with the DNO or transmission operator, so that connection is delivered on a defensible, compliant basis.
1. Load and supply study. We establish the required capacity, growth and resilience, and check available supply options with the network operator.
2. Connection application. We prepare the technical information for the grid connection, including G99 where generation or storage is connected.
3. Substation design. We design the 11 kV or 33 kV substation layout, equipment ratings, earthing and protection to IEC 61936 and the relevant ENA standards.
4. Protection and coordination. We set protection relays and coordinate them with the network operator and the downstream LV system.
5. Construction and commissioning support. We review installation and witness testing and energisation with the network operator.
Engineering Recommendation G99 sets the requirements for connecting generation, including battery storage, to distribution networks in Great Britain. It covers application, technical requirements and testing.
It depends on network capacity at the location. Early engagement with the network operator and a complete application are the best ways to secure a realistic date.
Yes. Earthing is designed for the substation and the site as a whole, including step and touch voltage checks.
NOVTRIQ delivers substation design, protection coordination and grid connection engineering for reliable medium and high voltage networks.