MV/HV Power Engineering

Medium and high voltage systems demand precise design, protection and grid coordination. NOVTRIQ delivers MV and HV power engineering for 11kV and 33kV networks, covering substation design, protection coordination and grid connection, so that new and upgraded connections are safe, compliant and reliable.

Discuss Your Project

What we deliver

  • Substation Design (11kV / 33kV): primary and secondary layouts, switchgear and transformer specification, and single-line diagrams
  • Protection Coordination Study: relay grading, fault-level analysis and discrimination across the MV/HV network
  • Grid Connection Application Support: G99 compliance, DNO or network operator applications and capacity assessment
  • Earthing and Bonding Design: earthing study, step and touch potential assessment and bonding strategy
  • Power System Studies: load flow, short-circuit and arc flash assessment to inform ratings and safety
  • Cable and Equipment Rating: HV cable sizing, ratings and specification against thermal and fault-withstand limits

Who it is for

  • Industrial and commercial sites requiring new or upgraded MV/HV connections
  • Developers and operators of hospitals, manufacturing plants and energy assets
  • Asset owners needing protection coordination and grid connection support

Standards & regulations

IEC 61936-1ENA G99ENA G5/5 (harmonics)BS 7671:2018+A2:2022IEC 60909 (short-circuit)BS EN 62271 (HV switchgear)Electricity at Work Regulations 1989Distribution Code

Substation design and equipment specification

We design MV and HV substations from concept single-line through to equipment schedules, specifying switchgear, transformers and protection to IEC 61936 and relevant BS EN standards. Ratings are set from fault-level and load studies so that plant is neither under-rated for safety nor over-specified for cost.

Protection coordination and system studies

Protection is graded to isolate faults quickly while preserving supply to healthy circuits. Load flow, short-circuit and arc flash studies underpin relay settings, discrimination and equipment ratings, giving a coherent, safe and selective protection scheme across the network.

Grid connection and compliance

For new and upgraded connections, we manage the technical path: G99 compliance, network operator applications, capacity studies and coordination with the DNO or transmission operator, so that connection is delivered on a defensible, compliant basis.

How a project runs

1. Load and supply study. We establish the required capacity, growth and resilience, and check available supply options with the network operator.

2. Connection application. We prepare the technical information for the grid connection, including G99 where generation or storage is connected.

3. Substation design. We design the 11 kV or 33 kV substation layout, equipment ratings, earthing and protection to IEC 61936 and the relevant ENA standards.

4. Protection and coordination. We set protection relays and coordinate them with the network operator and the downstream LV system.

5. Construction and commissioning support. We review installation and witness testing and energisation with the network operator.

Frequently asked questions

What is G99?

Engineering Recommendation G99 sets the requirements for connecting generation, including battery storage, to distribution networks in Great Britain. It covers application, technical requirements and testing.

How long does a new connection take?

It depends on network capacity at the location. Early engagement with the network operator and a complete application are the best ways to secure a realistic date.

Do you design earthing systems?

Yes. Earthing is designed for the substation and the site as a whole, including step and touch voltage checks.

Ready to design and connect MV/HV power that stays safe and selective?

NOVTRIQ delivers substation design, protection coordination and grid connection engineering for reliable medium and high voltage networks.