Arc flash events release intense heat, pressure and light in milliseconds, endangering people and plant. NOVTRIQ delivers arc flash studies that quantify incident energy across your electrical network, define safe working distances, and produce the labelling and PPE guidance operators need to work safely and stay compliant.
Discuss Your ProjectWe build a validated single-line model of the installation and run short-circuit and protection studies using industry platforms such as ETAP and SKM. Incident energy is calculated to IEEE 1584, with arc flash boundaries derived for each node. Where protection settings drive high incident energy, we recommend coordination changes, maintenance switching or arc-reduction measures to lower risk at source.
Study outputs translate into practical controls: durable equipment labels, a task-based PPE schedule, and safe systems of work aligned to NFPA 70E principles and UK electrical safety duties. We advise on de-energised working as the primary control, and on the assessment required before any energised task proceeds.
Arc flash rarely sits alone. We coordinate findings with short-circuit ratings, earthing and bonding, and DSEAR requirements in hazardous areas, so that a single, consistent electrical safety picture supports both compliance and day-to-day operations.
1. Data collection. We gather single line diagrams, protective device settings, cable schedules and utility fault level data, and verify them on site where records are incomplete.
2. System model. We build the network model, run short circuit and protection coordination studies, and check that device settings clear faults as intended.
3. Incident energy calculation. We calculate arcing current and incident energy at each piece of equipment using the IEEE 1584 method, for each normal and alternative operating configuration.
4. Results and labels. We issue the report, arc flash boundaries, PPE categories and equipment labels, and highlight the locations where incident energy can be reduced by design.
5. Mitigation. Where values are high, we recommend measures such as faster protection settings, maintenance switching or remote racking, and recalculate to show the effect.
6. Review cycle. The study is reviewed whenever the system changes and at regular intervals, so labels and procedures stay valid.
The Electricity at Work Regulations 1989 require employers to prevent danger from electrical systems, including arc flash. An arc flash study is the recognised way to quantify that risk and to set safe working arrangements, and many clients and insurers now require one.
Up to date single line diagrams, protective device types and settings, cable sizes and lengths, transformer data and the fault level at the point of supply. Where records are missing, we collect the data on site.
Whenever the electrical system changes in a way that affects fault levels or protection, and at regular intervals as part of maintenance planning.
NOVTRIQ delivers engineering-grade arc flash studies that make energised work safer and compliance defensible.